Fitting My Duratec.
Here is the first instalment of the engine fitting process, Saturday 19th October.
|
|
|
|
The Gearbox with the old Sierra Bellhousing |
The new Bellhousing |
|
|
|
|
|
|
|
|
|
|
New Belhousing fits perfectly on the Type 9. |
The Mondeo Clutch Release Bearing assembly fits the new Bellhousing |
|
|
|
|
All bolted up with original Flywheel and Clutch. |
Engine in place for trial fitment. |
|
|
|
|
I have decided to move the engine back a wee bit |
This will require some bulkhead surgery |
|
|
|
| Nice direct to head Throttle Bodies. | I can almost hear them :) |
|
|
|
|
Here is the Second Instalment 21st December |
|
|
|
|
|
|
|
|
The Bulkhead gets cut out. |
|
|
|
|
|
Engine in final Position. |
Engine mounts are made and tacked into place. |
|
|
|
|
Thats better more room to swing my spanners. |
|
|
|
|
|
Near Side Engine Mount. |
|
|
|
|
|
Off Side Engine Mount. |
|
|
|
|
|
And From Underneath. |
|
|
|
|
|
The dry sump system from pace will give me a bit more room. |
Dry sump pump and oil adapter in place. |
|
|
|
|
|
|
|
A bit more room on the X Member now :) |
Another one of the pump. |
|
|
|
|
A nice pic of the bottom of the car. |
A new gearbox tunnel is fabricated |
|
|
|
|
More of the bulkhead is removed and the cuts are now tidy. |
|
|
UPDATE JULY 2003 |
|
![]() |
![]() |
|
The new bulkhead is fabricated and sealed up. |
|
![]() |
|
|
|
|